 After an oil-bearing structure is found to have industrial oil and gas flow through preliminary exploration, detailed exploration should be carried out immediately and it will be gradually put into development. The so-called oilfield development is based on the detailed exploration results and necessary productive development tests, on the basis of comprehensive research, for oilfields with industrial value, in accordance with the country's requirements for crude oil production, starting from the actual situation and production laws of oilfields, formulate Reasonable development plan and construction and production of the oilfield, so that the oilfield can produce long-term production according to the predetermined production capacity and economic effect, until the end of the development process.

oilfield


Introduction


The formal development of an oil field generally goes through three stages:

1. Preparatory stage before development, including detailed exploration and development tests;

2. Development design and production, including oil layer research and evaluation, overall arrangement of development wells, formulation and implementation of perforation plans and injection-production plans;

3. Adjustment and improvement of the program.

The formulation and implementation of the oilfield development plan is the central link of the oilfield development. It is necessary to conduct a detailed and comprehensive comparison of various feasible plans in a practical and complete manner, and then determine the plan that is practical, technologically advanced, and economically superior. In fact, although efforts have been made to improve the oilfield development plan, it is impossible to clearly understand the oilfield geological conditions before the oilfield development, which inevitably leads to some problems after the oilfield is put into production. The original estimate was insufficient, its production dynamics did not match the plan, and the state constantly put forward new requirements for the oil field, so it must be constantly adjusted in the process of oil field development. Therefore, the whole process of oilfield development is a process of constant re-understanding and constant adjustment.


Guidelines and Principles for Oilfield Development


The oilfield development policy is an important basis for compiling and implementing the oilfield development plan. The correct oilfield development policy is formulated according to the national economy's requirements for the oil industry and the long-term experience of oilfield development.


1. Carry out regional exploration and use various effective means to identify favorable oil-bearing areas as soon as possible, find out the law of crude oil enrichment, and determine key development areas and major oil layers;


2. Exploration, development, construction and production must be simultaneously implemented, that is, the so-called "trilateral policy" of simultaneous exploration, construction and production;


3. In order to make the oil field have high and stable production for a long time, under the principle of rare wells and high production, early internal enhanced water injection and enhanced oil recovery should be implemented to ensure high and stable production.


When compiling a development plan for an oil field, specific development principles, specific technical policies and boundaries must be formulated in accordance with the country's general policy on oil production, and in light of the conditions of the oil field to be developed and the technological means and construction capabilities mastered. 

These principles are:


1. Oilfield development should take water injection as the key link, and implement early internal cutting water injection and layered water injection to maintain oil layer pressure, realize long-term self-injection production of oil wells, and make production management proactive.


2. In the early stage of oilfield development, larger well spacing should be adopted and well pattern should be arranged reasonably. At the same time, the production test area should be opened first in the oil field, and the static and dynamic characteristics of the oil field should be grasped in detail, so as to guide the whole oil field to carry out infill drilling more effectively and put into development reasonably.


3. Vigorously carry out the geological research of the oil field, divide the development layers reasonably and strictly, choose the reasonable water injection method and rationally arrange the well pattern, so as to give full play to the production potential of various oil layers, and leave room for later adjustment.


4. Try to use the most advanced mining technology. For example, in terms of oil production technology, we will vigorously develop and adopt process technologies such as layered observation, layered oil production, layered water injection, layered transformation and layered adjustment control, so as to achieve reasonable injection-production balance and pressure balance, and achieve high oil recovery rate. and a longer period of stable production, further improving oilfield recovery.